![]() |
||||||||||||||
| Projects > Landfill Division | ||||||||||||||
|
|
Subcontract under Clary Hood Contracting Co. to perform grading and clay liner installation at the Washington County, GA landfill in Saundersville, GA Prime Contractor to BFI Waste Management, Inc. for construction of cell addition including grading, installation of 10(-7) clay liner, geosynethic liner, 2-foot protective cover layer, leachate collection systems and entrance road to cell at Morris Farms Landfill in Lawrence County, Alabama. Prime Contractor to Jefferson County Environmental Department for construction of cell addition including grading, installation of 10 (-5) clay liner, geosynethic liner, 2-foot protective cover layer, leachate collection systems, slope stabilization, and berms for cell at Jefferson Count Landfill No. One in Morris, Alabama. Prime Contractor to Shelby County Commission for construction of an 19-Acre Cell Addition that included 100,000 cubic yards of unclassified excavation, 250,000 cubic yards of borrow excavation, 2-foot clay liner, 10 (-5) geosynethic liner, 2-foot protective cover layer, protective cover, leachate collection system including 85,000 gallon holding tank at the Shelby County Landfill in Columbiana, Alabama. Prime Contractor to Columbus (Georgia) Consolidated Government for construction of an 10-Acre Cell Addition that included 200,000 cubic yards of unclassified excavation, borrow excavation, 2-foot clay liner, 10 (-7) liner, 2-foot protective cover layer, leachate collection system, 7,000 feet of under-cell underdrain drainage system including storm detention area, perimeter roadway and 2,100 feet of 21-feet wide drainage flume at the Pine Grove Municipal Solid Waste Landfill in Columbus, Georgia. Prime Contractor to Allied Waste, Inc. for construction of a 30-Acre Landfill Closure in Atlanta, Georgia including grading, installation of 10(-7) clay liner, geosynethic liner, 2-foot protective cover layer, storm water collection system, and revegatation of disturbed area. Prime Contractor to Alamance County, NC for the Cell Expansion at Austin Quarter Road Landfill in Graham, NC including 200,000 CY of Excavation, placement of 10(-5) clay liner, geosynethic liner, installation of HDPE Liner and Geocomposite, placement of 2-foot protective cover layer, storm water collection system, and revegatation of disturbed area. Prime Contractor to Douglas County, Georgia for the Cell Closure at Cedar Mountain Road Landfill in Douglasville, GA including , placement of 10(-5) clay liner, placement of protective cover layer, storm water collection system, and revegatation of disturbed area. Prime Contractor to Decatur County, Georgia for New Facilities Construction at US Hwy 27 MSW Landfill for the County Commissioners. Work includes preparing and processing existing clay layer for HDPE Liner, GCL Installation, HDPE liner and leachate system installation, and protective cover installation and certification, installation a 85,000 gallon leachate storage tank, leachate pumps, control panels, transfer pumps and loading station. Prime Contractor to Floyd County-Rome, Georgia Government for Cell Seven Construction at the Walker Mountain Road Landfill in Rome. Work includes clearing, 120,000 CY excavation 3,500 CY rock excavation, importing 50,000 CY of 1x10(-7) clay, HDPE liner installation, import pea gravel for protective cover, complete leachate system, connection to existing system. Prime Contractor to Greenwood County (SC) Public Works Department for the construction of an 18 Acre Cell Expansion at the County Facility. Work includes 195,000 CY excavation, placing 55,000 CY of 1x10(-7) clay, 700,000 SF of 60-Mil HDPE Liner, Import and place 75,000 tons of sand protective cover and install leachate collection system. Prime Contractor to the City of Birmingham (AL) for the construction of the first Solid Waste (14 Acre) Cell at the New Georgia Landfill that included 450,000 cubic yards of Unclassified Excavation (with Rock excavation), 1-foot 10(-5) clay liner, leachate collection system, Duel 150,000 gallon storage tank system, Storm drainage with detention pond, 4,000 feet of access and perimeter roads.
T & K Construction, LLC
![]() |
||||||||||||
|
||||||||||||||